Beating Time Pressure with Air Pressure

assorted carriers

STEP ONE:

  • In the minutes box enter the minutes spent on round trips from point "A" to point "B". Check actual time and put in some allowance due to interference and diversions.
  • In the trips per day box enter the amount of trips that are taken during an average work day.
Minutes:       Trips Per Day:   
STEP TWO:
  • Enter the average hourly wage of persons making the trip. Company burden and overhead needs to be considered.
 Hourly Wage:   
STEP THREE:
  • Enter the total cost of the Airlink system that you were quoted from our representative. Once you have completed click on the calculate button to see your result.
 AirTubes Quote:        
RESULT:
 The AirTubes System pays for itself in      months.

Lamson Airtubes, LLC10 Millpond Drive• Lafayette, NJ 07848

Telephone 973.300.4267 Toll-Free 866.AIRTUBES
Fax 973.300.1932 • sbegraft@airtubes.com
© 2005 AirTubes Inc. All Rights Reserved